Maintenance Details


Date09 May 2020
Start Time11:00:50
End Time12:30:50
Nature Of MaintenanceMechanical
EquipmentCHIPPING YARD CRANE NO. 2
Type of MaintenanceScheduled Maintenance
DetailsCHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. GREASING OF COUPLING AND SHAFT CONDITION IS GOOD.
2. check the gearbox oil level, leakage, and fill if required. GEARBOX IS OK.
3. check all fasteners and mounting bolts. IT IS OK.
4. check frame welding conditions. IT IS OK.
5. check end traveling gears condition and do the greasing. IT IS OK.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. IT IS OK.
2. check the gearbox oil level, leakage, and fill if required. GEARBOX IS OK.NO LEAKAGE.
3. check all fasteners and mounting bolts. IT IS OK.
4. check frame welding conditions. IT IS OK.
5. check end traveling gears condition and do the greasing. IT IS OK.

HT.
1. check rope drum, hook, rope condition. greasing of rope. GREASING OF ROPE IS DONE.
2. check all fasteners and mounting bolts. it is ok.
3. check frame welding conditions. it is ok.

Remark(not set)
FurnaceOther
StatusCompleted