Maintenance Details
| Date | 06 May 2020 |
|---|---|
| Start Time | 07:30:30 |
| End Time | 12:30:30 |
| Nature Of Maintenance | Electrical |
| Equipment | TAPPING SEC. CRANE NO. 2 |
| Type of Maintenance | Scheduled Maintenance |
| Details | TAPPING SECTION E.O.T. CRANE 2 LT, CT, HT 1. checked the motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok. 2. check panel board, clean, & tight all loose parts. we checked and tight all loose contacts in panel board. 3. all parts clean by hand blower. 4. checked limit switches and its condition. all limit switches and wires working properly. |
| Remark | (not set) |
| Furnace | Other |
| Status | Completed |