Maintenance Details


Date02 May 2020
Start Time21:51:25
End Time21:51:25
Nature Of MaintenanceElectrical
EquipmentWASHING PLANT
Type of MaintenanceScheduled Maintenance
DetailsWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. It is ok.
2. check panel board, clean, & tight all loose parts.it is ok.we tight all loose connection.
3. all parts clean by hand blower. Cleaning is done.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's working.
5. check the high mast lights also.all lights are working.
Remark(not set)
FurnaceOther
StatusCompleted