Maintenance Details
| Date | 30 Apr 2020 |
|---|---|
| Start Time | 10:30:25 |
| End Time | 11:30:30 |
| Nature Of Maintenance | Mechanical |
| Equipment | CHIPPING YARD CRANE NO. 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | CHIPPING YARD E.O.T. CRANE 1 LT. 1. checked coupling, shaft, and pedestal bearing condition. The shaft condition is not good. 2. checked the gearbox oil level is good.no leakage. 3. checked all fasteners and mounting bolts. 4. check frame welding conditions.it is ok. 5. check end traveling gears condition. one wheel is not good. CT. 1. checked CT travel condition is ok. 2. check frame welding conditions. it is ok. HT. 1. checked rope. it is ok. we change 2 sealing for lifting the metal. |
| Remark | (not set) |
| Furnace | Other |
| Status | Completed |