Maintenance Details
| Date | 29 Apr 2020 |
|---|---|
| Start Time | 10:00:55 |
| End Time | 12:30:55 |
| Nature Of Maintenance | Mechanical |
| Equipment | TAPPING SEC. CRANE NO. 2 |
| Type of Maintenance | Scheduled Maintenance |
| Details | LT. 1. checked coupling, shaft, and pedestal bearing condition greasing is done. 2. checked the gearbox oil level. no leakage. 3. checked all fasteners and mounting bolts. 4. checked frame welding conditions.it is ok. 5. checked end traveling gears condition. it is ok. CT. 1. checked coupling, shaft, and pedestal bearing condition. greasing is done. 2. checked the gearbox oil level. no leakage. 3. checked all fasteners and mounting bolts. 4. checked frame welding conditions.it is ok. 5. checked end traveling gears condition and greasing is done. 6. one bearing of CT trolly wheel is damaged. so change it. bearing no is P209 HT. 1. checked rope drum, hook, rope condition.it is ok. 2. checked the thruster drum condition and its brake tightness. 3. checked all fasteners and mounting bolts. It is ok. 4. checked frame welding conditions.it ios ok. |
| Remark | (not set) |
| Furnace | Other |
| Status | Completed |