Maintenance Details


Date25 Apr 2020
Start Time07:30:15
End Time16:30:15
Nature Of MaintenanceElectrical
EquipmentOTHERS
Type of MaintenanceScheduled Maintenance
DetailsWASHING PLANT
TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR

1. checked the motor condition. it is ok.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition. some limit switches not work we fix it.
5. check the street lights also.it is ok.
Remark(not set)
FurnaceOther
StatusCompleted