Maintenance Details


Date24 Apr 2020
Start Time13:41:00
End Time13:41:00
Nature Of MaintenanceMechanical
EquipmentOTHERS
Type of MaintenanceScheduled Maintenance
DetailsF1- ELECTRODE BLOWER 1,2,3 & SEAL COOLING BLOWER 1, HYDRAULIC POWER PACK, WATER MANIFOLD
1. checking loose parts and check the hydraulic oil level in the tank.it is ok.
2. check solenoid valve working conditions and adjust oil pressure.it is ok.
3. by air clean all dust from the cylinders.
4. check the water manifold line and check the T section of pipes. water manifold lines some T and valves condition is not good. we inform this.
5. checked the Transformer heat exchanger. no leakage.

F2- ELECTRODE BLOWER 1,2,3 & SEAL COOLING BLOWER 1, HYDRAULIC POWER PACK, WATER MANIFOLD
1. checking loose parts and check the hydraulic oil level in the tank.it is ok.
2. check solenoid valve working conditions and adjust oil pressure.it is ok.
3. by air clean all dust from the cylinders.
4. check the water manifold line and check the T section of pipes. it is ok.
5. checked the Transformer heat exchanger. no leakage.
Remark(not set)
FurnaceOther
StatusCompleted