Maintenance Details
| Date | 24 Apr 2020 |
|---|---|
| Start Time | 07:30:30 |
| End Time | 16:30:30 |
| Nature Of Maintenance | Electrical |
| Equipment | OTHERS |
| Type of Maintenance | Scheduled Maintenance |
| Details | F1- ELECTRODE BLOWER 1,2,3 & SEAL COOLING BLOWER 1, HYDRAULIC POWER PACK, TRANSFORMER 1. checked motor condition.no noise coming from it. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. checked transformer temp. and oil level. it is ok. 5. checked solenoid valves. it is ok. F2- ELECTRODE BLOWER 1,2,3 & SEAL COOLING BLOWER 1, HYDRAULIC POWER PACK, TRANSFORMER 1. checked motor condition.no noise coming from it. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. checked transformer temp. and oil level. it is ok. 5. checked solenoid valves. it is ok. |
| Remark | (not set) |
| Furnace | Other |
| Status | Completed |