Maintenance Details


Date22 Apr 2020
Start Time07:30:35
End Time16:30:35
Nature Of MaintenanceMechanical
EquipmentOTHERS
Type of MaintenanceScheduled Maintenance
DetailsTAPPING SECTION E.O.T. CRANE 1,2, AND
3RD FLOOR carbon paste lifting crane

LT.
1. coupling, shaft, and pedestal bearing condition checked and greasing is done.
2. the gearbox oil level checked. No leakage.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions.
5. checked end traveling gears condition and do the greasing it is ok.

CT.
1. coupling, shaft, and pedestal bearing condition checked and greasing is done.
2. checked the gearbox oil level.
For crane no 2 ct gear box has leakage.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions.
5. checked end traveling gears condition and do the greasing.

HT.
1. checked rope drum, hook, rope condition.
2. checked the thruster drum condition and its brake tightness.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions.
Remark(not set)
FurnaceOther
StatusCompleted