Maintenance Details


Date18 Apr 2020
Start Time07:30:00
End Time12:30:15
Nature Of MaintenanceElectrical
EquipmentOTHERS
Type of MaintenanceScheduled Maintenance
DetailsWASHING PLANT
TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR

1. checked the motor condition ( amp, volt, and connectivity) no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. all limit switches and wires working properly.
5. checked the street lights.
Remark(not set)
FurnaceOther
StatusCompleted