Maintenance Details
| Date | 20 Feb 2022 |
|---|---|
| Start Time | 09:00:45 |
| End Time | 18:00:45 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 1 |
| Type of Maintenance | Scheduled Shutdown |
| Details | zesco shutodwn its 2nd floor all hydraulic hose pipe checked and tight. 1 no's sliping cylinder changed. electrodre 1 A2 clamp change with insulation and suspension link. all electrode pressure ring bolt nut tight with insulation. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |