Maintenance Details


Date06 Feb 2022
Start Time06:00:40
End Time03:00:00
Nature Of MaintenanceMechanical
EquipmentFURNACE 1
Type of MaintenanceScheduled Shutdown
Detailszesco shutdown Details
pollution chimney duct line connection work is done.
contact clamp suspension link 4 sets changed.
E3 slipping cylinder changed.
E3 & E1 pressuring pipe welding.
E2 pressure ring hanger insulation done
E3 protection shield to mental insulation
hood center part welding
hood part number 1,2 and 3 welding
pump number 2 NRV repairing
E1 contact clamp hose pipes changed
transformer riser side 2 nos hose pipe changed.
charging chute number 2 repairing
E3 mantle lower waterline valve replacement
hydraulic power pack oil leakage arrested



Remark
FurnaceFurnace I
StatusCompleted