Maintenance Details


Date30 Dec 2021
Start Time03:04:31
End Time03:04:31
Nature Of MaintenanceMechanical
EquipmentCHIPPING YARD CRANE NO. 2
Type of MaintenanceScheduled Maintenance
Detailsits l.t. shaft is broken. we are making it on lathe.
CHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

Remark
FurnaceOther
StatusCompleted