Maintenance Details


Date23 Dec 2021
Start Time07:30:25
End Time23:59:25
Nature Of MaintenanceMechanical
EquipmentFURNACE 1
Type of MaintenanceScheduled Shutdown
Detailspollution fume system duct line work start.
electrode 1
A5 A6 contact clamp, with insulation, suspension link changed with insulation.
all spring and pressure ring bolt changed.
all copper clamps insulation changed.
A2,A3 suspension link changed.
seal box rope changed.
1nos pressure ring tie rod changed.
all pressuring leakage testing is done. all pressuring leakage testing is done.
electrode 2

all spring and pressure ring bolt changed.
all copper clamps insulation changed.
seal box rope changed.

electrode 3
C2 contact clamp, with insulation, suspension link changed with insulation.
all spring and pressure ring bolt changed.
all copper clamps insulation changed.
C6 suspension link changed.
seal box rope changed. all pressuring leakage testing is done.




Remark
FurnaceFurnace I
StatusCompleted