Maintenance Details
| Date | 23 Dec 2021 |
|---|---|
| Start Time | 07:30:25 |
| End Time | 23:59:25 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 1 |
| Type of Maintenance | Scheduled Shutdown |
| Details | pollution fume system duct line work start. electrode 1 A5 A6 contact clamp, with insulation, suspension link changed with insulation. all spring and pressure ring bolt changed. all copper clamps insulation changed. A2,A3 suspension link changed. seal box rope changed. 1nos pressure ring tie rod changed. all pressuring leakage testing is done. all pressuring leakage testing is done. electrode 2 all spring and pressure ring bolt changed. all copper clamps insulation changed. seal box rope changed. electrode 3 C2 contact clamp, with insulation, suspension link changed with insulation. all spring and pressure ring bolt changed. all copper clamps insulation changed. C6 suspension link changed. seal box rope changed. all pressuring leakage testing is done. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |