Maintenance Details


Date15 Dec 2021
Start Time10:20:45
End Time11:15:45
Nature Of MaintenanceMechanical
EquipmentFURNACE 2
Type of MaintenanceBreakdown Shutdown
Detailsits electrode 3 has heavy sparking, we tight bolts and clamp number C2 has leakage. so we putting pulp.
after that we check electrode number 2 cooling blower making too much noise. we checked and found that motor base bolts are loose, we tight it. now its ok.
Remark
FurnaceFurnace II
StatusCompleted