| Date | 17 Nov 2021 |
|---|---|
| Start Time | 08:00:00 |
| End Time | 18:00:00 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 2 |
| Type of Maintenance | Scheduled Shutdown |
| Details | ZESCO POWER SHUTDOWN Electrode 1 contact clamp A4, has leakage from brazing we did brazing now its ok. ELECTRODE 2 contact clamp B5, suspension link, fork repaired and change with insulation. ELECTRODE 3 seal box rope changed now its ok. all bolts tighting is done. FOR COVERING FURNCE SHEEL TO BASE PLATE WELDING IS DONE. its hood pipes are damaged every time so we extend it with MS pipe up to 2nd floor and fitting it there so next time it cant damage. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |