Maintenance Details
| Date | 06 Nov 2021 |
|---|---|
| Start Time | 08:00:05 |
| End Time | 13:30:05 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 2 |
| Type of Maintenance | Breakdown Shutdown |
| Details | ZESCO POWER BREKDOWN SHUTDOWN ELECTRODE 2 contact clamp B6, suspension link, fork repaired and change with insulation. ELECTRODE 3 contact clamp C3, suspension link, fork repaired and change with insulation. ALSO SEAL BOX SIDE 3MTR 100 mm dia asbestos rope changed. After that we welding charging chute. Both hydraulic power packs leakage arrest. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |