Maintenance Details
| Date | 06 Nov 2021 |
|---|---|
| Start Time | 08:00:50 |
| End Time | 13:30:50 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 1 |
| Type of Maintenance | Breakdown Shutdown |
| Details | ZESCO POWER BREKDOWN SHUTDOWN Electrode 1 pressure ring 2 nos tie rod change with MS solid shaft also provide insulation. contact clamp A2, suspension link, fork repaired and change with insulation. ELECTRODE 2 PRESSURE RING 1nos tie rod change with water cooled SS pipe. contact clamp B2, suspension link, fork repaired and change with insulation. ELECTRODE 3 PRESSURE RING 2nos tie rod change with water cooled SS pipe. contact clamp C6, suspension link, fork repaired and change with insulation. After that we welding charging chute. Both hydraulic power packs leakage arrest. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |