Maintenance Details


Date06 Nov 2021
Start Time08:00:50
End Time13:30:50
Nature Of MaintenanceMechanical
EquipmentFURNACE 1
Type of MaintenanceBreakdown Shutdown
DetailsZESCO POWER BREKDOWN SHUTDOWN
Electrode 1
pressure ring 2 nos tie rod change with MS solid shaft also provide insulation.
contact clamp A2, suspension link, fork repaired and change with insulation.

ELECTRODE 2
PRESSURE RING 1nos tie rod change with water cooled SS pipe.
contact clamp B2, suspension link, fork repaired and change with insulation.

ELECTRODE 3
PRESSURE RING 2nos tie rod change with water cooled SS pipe.
contact clamp C6, suspension link, fork repaired and change with insulation.
After that we welding charging chute.

Both hydraulic power packs leakage arrest.
Remark
FurnaceFurnace I
StatusCompleted