Maintenance Details
| Date | 10 Oct 2021 |
|---|---|
| Start Time | 09:13:10 |
| End Time | 18:00:10 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 2 |
| Type of Maintenance | Scheduled Shutdown |
| Details | Zesco shutdown Electrode 1 Protection shield full vertical welding from 3 joints. A6 CLAMP changed with insulation All clamp mice sheet insulation changed with 3 nos inside pressure bolt, nut and springs. Electrode 2 Protection shield full vertical welding from 3 joints. B5 CLAMP changed with insulation All clamp mice sheet insulation changed with 2 nos inside pressure bolt, nut and springs. Electrode 3 Protection shield full vertical welding from 3 joints. All clamp mice sheet insulation checked and changed. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |