Maintenance Details


Date10 Oct 2021
Start Time09:13:10
End Time18:00:10
Nature Of MaintenanceMechanical
EquipmentFURNACE 2
Type of MaintenanceScheduled Shutdown
DetailsZesco shutdown
Electrode 1
Protection shield full vertical welding from 3 joints.
A6 CLAMP changed with insulation
All clamp mice sheet insulation changed with 3 nos inside pressure bolt, nut and springs.

Electrode 2
Protection shield full vertical welding from 3 joints.
B5 CLAMP changed with insulation
All clamp mice sheet insulation changed with 2 nos inside pressure bolt, nut and springs.

Electrode 3
Protection shield full vertical welding from 3 joints.

All clamp mice sheet insulation checked and changed.
Remark
FurnaceFurnace II
StatusCompleted