Maintenance Details


Date10 Oct 2021
Start Time09:10:25
End Time18:10:25
Nature Of MaintenanceMechanical
EquipmentFURNACE 1
Type of MaintenanceScheduled Shutdown
Detailszesco shutdown
Electrode 1
Full welding of pipe line with changing pipe line of pressure ring from P1 TO P2
ALL CLAMP insulation checked and changed.


ELECTORDE 2
All clamp insulation checked and changed.

Electrode 3
All clamp insulation checked and changed.
Remark
FurnaceFurnace I
StatusCompleted