Maintenance Details


Date29 Sep 2021
Start Time08:00:30
End Time18:00:30
Nature Of MaintenanceMechanical
EquipmentFURNACE 2
Type of MaintenanceScheduled Shutdown
DetailsIt's electrode 1
Pressure ring lifting and welding is done.
A5 contect clamp changed. With full breazing.
A3 and A4 clamp breazing is done.
A3 CLAMP SIDE Mentel lower leakage arrest by opening full bus tube and then upper and lower side breazing is done.
Remark
FurnaceFurnace II
StatusCompleted