Maintenance Details
| Date | 29 Sep 2021 |
|---|---|
| Start Time | 08:00:30 |
| End Time | 18:00:30 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 2 |
| Type of Maintenance | Scheduled Shutdown |
| Details | It's electrode 1 Pressure ring lifting and welding is done. A5 contect clamp changed. With full breazing. A3 and A4 clamp breazing is done. A3 CLAMP SIDE Mentel lower leakage arrest by opening full bus tube and then upper and lower side breazing is done. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |