Maintenance Details
| Date | 01 Oct 2021 |
|---|---|
| Start Time | 09:00:30 |
| End Time | 18:00:00 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 1 |
| Type of Maintenance | Scheduled Shutdown |
| Details | Electrode 1 Preassure ring lifting with 3 nos fork change with full welding. Pressure ring joint bolt fitting is done. Sealbox rope change. Eletrode 2 Pressure ring lifting with 2nos fork change with full welding. Seal box rope change. Electrode 3 Pressure ring liftingbwith 2 nos fork changed. With full welding.sealbox rope change Hood hose pipe changed. One hose pipe 2and 1/2 inch 3mtr changed Water mainefold side dummy with tee changed.with full welding. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |