Maintenance Details


Date19 Mar 2021
Start Time11:20:30
End Time11:20:30
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 1
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.
Remark
FurnaceFurnace I
StatusCompleted