| Furnace Name | Furnace I |
|---|---|
| Furnace Name | 17 May 24 |
| Time | 19:00:00 |
| TAP | 10 |
| KV | 10.96 |
| F/C Reading KWH | 261829.9 |
| F/C Reading KVAH | 313270.9 |
| F/C Consumption KWH | 4.7 |
| F/C Consumption KVAH | 5.7 |
| F/C Consumption PF | 0.82 |
| Primary Current E1 | 299 |
| Primary Current E2 | 299 |
| Primary Current E3 | 301 |
| SEC Voltage E1 | 107 |
| SEC Voltage E2 | 107 |
| SEC Voltage E3 | 106 |
| Holder Position E1 | 600 |
| Holder Position E2 | 450 |
| Holder Position E3 | 450 |
| Temp: A/T Oil | 0 |
| Temp: A/T Winding | 0 |
| Temp: F/T Oil | 40 |
| Temp: F/T Winding | 50 |