Maintenance Details
| Date | 11 Feb 2021 |
|---|---|
| Start Time | 19:30:15 |
| End Time | 10:50:15 |
| Nature Of Maintenance | Mechanical |
| Equipment | ELECTRODE 3 |
| Type of Maintenance | Breakdown Shutdown |
| Details | It's pressure ring has leakage. But when I was check I found that it's clamp no. C4 cup is leakage. We switch off furnace and doing brazing. After that we weld pressure ring pipe line. At water manifold side I was found that C4 T thread is damaged. Than we cut it and fitting new one. Now it's ok. We also found that B1 Clamp connector side leakage. We use M SEAL to fix it. Now it's ok. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |