Maintenance Details


Date16 Jan 2021
Start Time08:00:30
End Time16:30:30
Nature Of MaintenanceElectrical
EquipmentWASHING PLANT
Type of MaintenanceScheduled Maintenance
DetailsWASHING PLANT TILTING HOPPER, CONVEYOR NO 1 motor bearing problem is their, so we replaced the motor, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
Remark
FurnaceOther
StatusCompleted