Maintenance Details
| Date | 01 Jan 2021 |
|---|---|
| Start Time | 12:12:30 |
| End Time | 12:12:30 |
| Nature Of Maintenance | Mechanical |
| Equipment | HYDRAULIC POWER PACK NO. 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | 1. checking loose parts and check the hydraulic oil level in the tank. 2. check solenoid valve working conditions and adjust oil pressure. Oil level is low. 3. check hydraulic line leakage. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |