Iron Ore

Total Supplied: 9682.34

Total Consumed: 8967.22

Quantity Remaining: 779.39

Over Consumption: 64.27

Stock limit: Not Set (Reset limit)

  • Iron Ore: 715.1
  • N/A: 715.1
# Lot Name Quantity Supplied Quantity Consumed Quantity Remaining
1 George Kangwa-Iron Ore 76.93 76.93 0
2 Iron Ore (Banda) 118.62 118.62 0
3 Sinai Rock Investments-Iron Ore 19.65 19.65 0
4 Solomon Tembo- Iron Ore 1067.91 1067.91 0
5 Ireen Mwansa - Iron Ore 106.51 106.51 0
6 Alex Siulemba- Iron Ore 3267.33 3267.33 0
7 Teseny General Dealers- Iron Ore 29.14 29.13 0.01
8 ACCELERATED GERMINATION CORPORATION 1358.58 1358.58 0
9 DENNINGA WORLD MARKET AGENCY 59.66 59.66 0
10 Kabwe Zinc Iron Ore 159.06 159.06 0
11 OS 2023 ACCDERATED GERMINATION IRON ORE 455.67 455.66 0.01
12 OS 2023 DENNIS IRON ORE 82.86 82.86 0
13 OS 2023 GEORGE KANGWA IRON ORE 32.72 32.72 0
14 OS 2023 KABWE ZIN LTD IRON ORE 113.82 113.82 0
15 OS 2023 KEMOSE MINING LTD IRON ORE 45.24 45.24 0
16 OS 2023 MM.KUMWENDA IRON ORE 35.58 35.58 0
17 OS 2023 SAINI ROCK INVESTMENTS IRON ORE 19.65 19.64 0.01
18 OS 2023 SOLOMON TEMBO IRON ORE 98.85 98.86 -0.01
19 ALEX SILUMBA IRON ORE FY 2023 818.36 818.36 0
20 Iron Ore- JIMMY BANDA 287.52 351.78 -64.26
21 Alex Iron ore ZMW 830 0 0 0
22 JIMMY BANDA IRON ORE K650 1019.3 379.51 639.79
23 Alex Iron Ore 2026 300.44 269.81 30.63
24 Accelerated Iron Ore 2026 85.9 0 85.9
25 KEMOSE MINING IRON 2026 23.04 0 23.04