Maintenance Details


Date11 Dec 2020
Start Time12:13:30
End Time12:13:30
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 1
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank. it's ok. some hydraulic has small lekage.
2. check solenoid valve working conditions and adjust oil pressure. its ok.
3. check hydraulic line leakage.
Remark
FurnaceFurnace I
StatusCompleted