Maintenance Details
| Date | 10 Dec 2020 |
|---|---|
| Start Time | 12:11:30 |
| End Time | 12:11:30 |
| Nature Of Maintenance | Mechanical |
| Equipment | CHIPPING YARD CRANE NO. 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.checking it's ok. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. Checking it's ok. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. Checking it's ok. 2. check the thruster drum condition and its brake tightness.break is ok. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. |
| Remark | |
| Furnace | Other |
| Status | Completed |