Maintenance Details
| Date | 04 Dec 2020 |
|---|---|
| Start Time | 12:16:30 |
| End Time | 12:16:30 |
| Nature Of Maintenance | Mechanical |
| Equipment | HYDRAULIC POWER PACK NO. 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | 1. checking loose parts and check the hydraulic oil level in the tank. it's ok. some hydraulic has small lekage. 2. check solenoid valve working conditions and adjust oil pressure. its ok. 3. check hydraulic line leakage. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |