Maintenance Details
| Date | 02 Dec 2020 |
|---|---|
| Start Time | 07:30:50 |
| End Time | 16:30:50 |
| Nature Of Maintenance | Mechanical |
| Equipment | POLLUTION 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | We add one small cyclone seprator with pump no. 4. We giving 4 inch pipe connection from pump and fit one 8 inch 90 degree bend on it. Down side we make one 45 degree bend of pipe 2 inch. We fit one butterfly control valve in 4inch pipe line. |
| Remark | |
| Furnace | Other |
| Status | Completed |