Maintenance Details


Date02 Dec 2020
Start Time07:30:50
End Time16:30:50
Nature Of MaintenanceMechanical
EquipmentPOLLUTION 1
Type of MaintenanceScheduled Maintenance
DetailsWe add one small cyclone seprator with pump no. 4. We giving 4 inch pipe connection from pump and fit one 8 inch 90 degree bend on it. Down side we make one 45 degree bend of pipe 2 inch. We fit one butterfly control valve in 4inch pipe line.
Remark
FurnaceOther
StatusCompleted