Maintenance Details


Date16 Nov 2020
Start Time07:30:30
End Time16:30:30
Nature Of MaintenanceMechanical
EquipmentRMHS CONVEYOR
Type of MaintenanceScheduled Maintenance
DetailsALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings. grease is already there.
2. lubrication of rollers and check conditions.its ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6 belt and BC 2 belt condition is not ok. we need to change it.
4. gearbox oil level check and if not then fill as per requirement.its ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing. BC 2 coupling changed.
6. check the drum condition. its ok.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
Remark
FurnaceOther
StatusCompleted