Maintenance Details
| Date | 12 Nov 2020 |
|---|---|
| Start Time | 07:30:30 |
| End Time | 16:30:30 |
| Nature Of Maintenance | Mechanical |
| Equipment | CHIPPING YARD CRANE NO. 2 |
| Type of Maintenance | Scheduled Maintenance |
| Details | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing.it is ok. greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. greasing is done. we found that it is damage. we open and repaired. 2. check the thruster drum condition and its brake tightness. no thruster. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions.it is ok. |
| Remark | |
| Furnace | Other |
| Status | Completed |