| Contract Number | SAFAL/P/MANGANESE ORE/06/2025/34 |
| Contract Date | 16 Jun 2025 |
| Type | Purchase |
| Supplier Name | True Ore Mines and Mineral ( Zambia) Limited |
| Description of Goods | Manganese Ore |
| Grade | High (44% - 50%) |
| Size | 10-100MM |
| Specifications | Mn 48% Min, Fe 3% max, SiO2 5% max, Al2O3 6% max, Phos 0.15% max |
| Quantity | 200 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL Plant, Kanona |
| Rate | 90 |
| Currency | US Dollar |
| VAT % | 16 |
| Mode/Terms of Payment | Advance Payment will be made upon producing weigh slip at loading point |
| Terms of Delivery | Ex Mansa |
| Delivery Period | Immediate |
| Dispatch Through | Buyer's hired trucks |
| Lot Number | True Ore Mn ore +48 |
| Remark | 1. Supplier to ensure material is as per PO specs only.
2. Buyer shall place trucks at seller's place and material will be weighed before it leaves Mansa.
3. The above price is on Ex Seller's factory and inclusive of MRT.
3. Council fee, PCC and loading charges will be borne by buyer. |
| Other Reference(s) | |
|---|