SAFAL/P/MANGANESE ORE/05/2024/55
| Contract Number | SAFAL/P/MANGANESE ORE/05/2024/55 |
| Contract Date | 28 May 2024 |
| Type | Purchase |
| Supplier Name | Peniel Mines Limited |
| Description of Goods | Manganese Ore |
| Grade | Ultra Low (Below 32%) |
| Size | 10-90MM(MIN 90%) |
| Specifications | mn min 32% |
| Quantity | 63.935 |
| Weight Unit | Metric Tonne |
| Destination | Safal plant Kanona |
| Rate | 21 |
| Currency | US Dollar |
| VAT % | 0 |
| Mode/Terms of Payment | Upon delivery at SAFAL plant and testing of the material |
| Terms of Delivery | delivered kanona |
| Delivery Period | IMMEDIATE |
| Dispatch Through | supplier hired trucks |
| Lot Number | PENIEL MINING MN ORE FY2024 |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-1 of 1 item.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 28 May 2024 | Peniel Mines Limited | Manganese Ore | Ultra Low (Below 32%) | 63.935 |
Total Supply: 63.94