Maintenance Details


Date08 Oct 2020
Start Time00:08:01
End Time00:08:01
Nature Of MaintenanceMechanical
EquipmentPOLLUTION 1
Type of MaintenanceScheduled Maintenance
Detailsclean already.
POLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
Remark
FurnaceOther
StatusCompleted