Maintenance Details
| Date | 02 Oct 2020 |
|---|---|
| Start Time | 07:30:01 |
| End Time | 16:30:01 |
| Nature Of Maintenance | Mechanical |
| Equipment | HYDRAULIC POWER PACK NO. 2 |
| Type of Maintenance | Scheduled Maintenance |
| Details | 1. checking loose parts and check the hydraulic oil level in the tank.its oil level is ok. 2. check solenoid valve working conditions and adjust oil pressure. solenoid valves are ok. 3. check hydraulic line leakage.no leakage. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |