Maintenance Details


Date02 Oct 2020
Start Time07:30:01
End Time16:30:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 2
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.its oil level is ok.
2. check solenoid valve working conditions and adjust oil pressure. solenoid valves are ok.
3. check hydraulic line leakage.no leakage.
Remark
FurnaceFurnace II
StatusCompleted