Maintenance Details


Date01 Oct 2020
Start Time07:30:01
End Time16:30:01
Nature Of MaintenanceMechanical
EquipmentPOLLUTION 1
Type of MaintenanceScheduled Maintenance
DetailsPOLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.clean and balancing is done. tight nut bolts.
2. check the balancing of impeller and vibration isolation.it is ok.
3. check v belts condition and inform if it's on critical stage.it is ok.
4. check foundation bolts and nuts of Plummer blocks.it is ok.
5. greasing the Plummer blocks.greasing is done.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature. it is ok.
Remark
FurnaceOther
StatusCompleted