Maintenance Details


Date14 Oct 2020
Start Time07:30:01
End Time16:30:01
Nature Of MaintenanceMechanical
EquipmentCHIPPING YARD CRANE NO. 1
Type of MaintenanceScheduled Maintenance
DetailsCHIPPING YARD E.O.T. CRANE 1
its break has a problem. we open it and its break drum repairing work is in progress. break drum welding and grinding are done on a lathe. ITS FITTING IS DONE.NOWITS OK.
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

Remark
FurnaceOther
StatusCompleted