Maintenance Details
| Date | 29 Sep 2020 |
|---|---|
| Start Time | 08:00:35 |
| End Time | 20:10:35 |
| Nature Of Maintenance | Mechanical |
| Equipment | FURNACE 2 |
| Type of Maintenance | Scheduled Shutdown |
| Details | CONTACT CLAMP NO. B5, B6 CHANGED. B5, B6 A5, AND C2 SIDE TIE ROD CHANGED. 2 NOS. HYDRAULIC PIPE CHANGED. ELECTRODE 3 SEAL SIDE ROPE TITED. ELECTRODE 1 SEAL BOX COOLING HOSE PIPE REPAIRED. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |