Maintenance Details


Date11 Sep 2020
Start Time07:30:01
End Time16:30:01
Nature Of MaintenanceMechanical
EquipmentELECTRODE 3
Type of MaintenanceScheduled Maintenance
Details1. by air pipe clean dust from all cylinders.clean and tight all hydraulic bolts and nuts.
2. check leakage of hydraulic oil. if it is then informed to HOD.small leakage we tight its nut and bolts in shutdown.now its ok.
3. its inside seal box protection shield is damaged. urgently we need to fix it.
Remark
FurnaceFurnace I
StatusCompleted