Maintenance Details
| Date | 04 Sep 2020 |
|---|---|
| Start Time | 07:30:01 |
| End Time | 16:30:01 |
| Nature Of Maintenance | Mechanical |
| Equipment | HYDRAULIC POWER PACK NO. 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | 1. checking loose parts and check the hydraulic oil level in the tank. hydraulic tank level is ok. slipping side small amount of leakage. 2. check solenoid valve working conditions and adjust oil pressure. it's ok. 3. check hydraulic line leakage. one hoisting cylinder side pipe is leakage, we change it on the next shutdown. |
| Remark | |
| Furnace | Furnace I |
| Status | Completed |