Maintenance Details


Date31 Aug 2020
Start Time13:30:01
End Time16:30:01
Nature Of MaintenanceMechanical
EquipmentRMHS CONVEYOR
Type of MaintenanceScheduled Maintenance
DetailsALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.grease is already there.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6, BC 5, AND BC 2 repairing is done.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 2 COUPLING CHANGING NEXT TIME.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. BC2 AND BC1 SIDE ROLLERS FITTING IS DONE.
Remark
FurnaceOther
StatusCompleted