Maintenance Details


Date14 Aug 2020
Start Time10:30:01
End Time11:30:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 1
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank. hydraulic tank level is ok. slipping side small amount of leakage.
2. check solenoid valve working conditions and adjust oil pressure. it's ok.
3. check hydraulic line leakage. one hoisting cylinder side pipe is leakage, we change it on the next shutdown.
Remark
FurnaceFurnace I
StatusCompleted