Maintenance Details


Date14 Aug 2020
Start Time10:00:01
End Time11:00:01
Nature Of MaintenanceElectrical
EquipmentHYDRAULIC POWER PACK NO. 1
Type of MaintenanceScheduled Maintenance
DetailsFURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. all solenoids are checking and it's ok.
Remark
FurnaceFurnace II
StatusCompleted