SAFAL/P/MN ORE/03.11/2022
| Contract Number | SAFAL/P/MN ORE/03.11/2022 |
| Contract Date | 20 Mar 2022 |
| Type | Purchase |
| Supplier Name | Chisabi Bosco Kipelembe |
| Description of Goods | Manganese Ore |
| Grade | Ultra Low (Below 32%) |
| Size | 25-150 MM (90% Min) |
| Specifications | MN 48% min |
| Quantity | 500 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL PLANT KANONA |
| Rate | 75 |
| Currency | US Dollar |
| VAT % | 0 |
| Mode/Terms of Payment | Upon delivery at SAFAL plant and testing of the material |
| Terms of Delivery | Loaded on trucks ex Mine without docs fee |
| Delivery Period | Immediately |
| Dispatch Through | SUPPLIER HIRED TRUCKS |
| Lot Number | Chisabi Bosco- Mn Ore HG |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-6 of 6 items.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 01 Mar 2022 | Chisabi Bosco Kipelembe | Manganese Ore | Ultra Low (Below 32%) | 29.8 |
| 2 | 01 Mar 2022 | Chisabi Bosco Kipelembe | Manganese Ore | Ultra Low (Below 32%) | 30.48 |
| 3 | 26 Mar 2022 | Chisabi Bosco Kipelembe | Manganese Ore | Ultra Low (Below 32%) | 19.24 |
| 4 | 12 Apr 2022 | Chisabi Bosco Kipelembe | Manganese Ore | Ultra Low (Below 32%) | 31.68 |
| 5 | 16 May 2022 | Chisabi Bosco Kipelembe | Manganese Ore | Ultra Low (Below 32%) | 30.06 |
| 6 | 25 May 2022 | Chisabi Bosco Kipelembe | Manganese Ore | Ultra Low (Below 32%) | 29.92 |
Total Supply: 171.18