Maintenance Details


Date07 Aug 2020
Start Time09:30:01
End Time10:30:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 2
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.its ok.
2. check solenoid valve working conditions and adjust oil pressure.solenoid is ok.
3. check hydraulic line leakage.we tight all bolts and nut in past shutdown.
Remark
FurnaceFurnace II
StatusCompleted