Maintenance Details


Date15 May 2026
Start Time00:27:01
End Time00:27:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 1
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.
Remark(not set)
FurnaceFurnace I
StatusOn going