Maintenance Details


Date05 Aug 2020
Start Time12:00:01
End Time12:30:01
Nature Of MaintenanceMechanical
EquipmentCARBON PASTE LIFTING CRANE
Type of MaintenanceScheduled Maintenance
Details3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done.
2. check the gearbox oil level, leakage, and fill if required. It is OK.we fill grease due to leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition and do the greasing. It is ok.greasing is done.
6.
CT.
It is ok. Gear bearing is ok.w


HT.
It's is ok. Pulley's condition is ok.greasing is done.
Remark
FurnaceOther
StatusCompleted